CEOS-WGCV – SAR Subgroup
Working Group on Calibration and Validation
Synthetic Aperture Radar Subgroup

Pre-launch Verification of the Sentinel-1 Commissioning Phase Facility

Document title
Pre-launch Verification of the Sentinel-1 Commissioning Phase Facility
Authors
Björn Rommen (European Space Agency, ESA-ESTEC)
Dirk Geudtner (European Space Agency, ESA-ESTEC)
Paul Snoeij (European Space Agency, ESA-ESTEC)
Ignacio Navas-Traver (European Space Agency, ESA-ESTEC)
Patrick Deghaye (European Space Agency, ESA-ESTEC)
Allan Ostergaard (European Space Agency, ESA-ESTEC)
Mike Brown (European Space Agency, ESA-ESTEC)
Yngvar Larsen (Norut, Norway)
Miguel Terra_Homem (Deimos, Portugal)
Publication date
2013-10-17
File
Download file
Categories
The document is listed in the following 1 categories: